The H1 ToF and VETO System beyond 2000:
Page is under
construction. Things may change quickly!
Sketch of H1 ToF 2000:
Get this figure in EPS format (useful for
including to documents)
Get this picture in PS format (useful
for direct printing)
The ToF group is going to submit an Intas proposal
Final version of our
proposal(gzipped ps-file)
The submitted Word
document
Unfortunately the proposal was not successful
Read the answer text from
INTAS.
Note about the upgrade of the ToF and VETO System (Jan 99):
Short description of the modifications
of the H1 Time-of-Flight System
in the framework of the H1/HERA upgrade (ps-file 1.4 MB)
Figures of the Note (EPS files)
Fig-1: Sketch of ToF system after the year 2000.
Fig-2: Sketch of the upgraded H1 Detector.
Fig-3: Sketch of the ToF electronics setup.
Fig-4: Sketch of the VETO electronics setup.
References:
List of H1-notes, Diploma theses and others:
text file
html file
First brainstorming:
Large Vetowall
Small Vetowall
Forward Timing System
Spacal ToF
The FiT (stays untouched)
Last update: January 11th,2000, Ch. Wissing