GO superconducting magnet


Click on the picture for the full size (1280x1024 pixel) JPEG file,
click on "small" for a reduced size (384x307 pixel) JPEG file.

PIC-25-3-01half Fr 20.10.2000
GO #3 arrives at DESY for H1
PIC-25-3-02half End can and lead tower with power cables
PIC-25-3-03half Heiner Brück inspects.
PIC-25-3-04half Lead tower on support frame
PIC-25-3-05half Power cables
PIC-25-3-07half Power cables conection
PIC-25-3-08half IP-end of the magnet on support fixture
PIC-25-3-09half Blind flange on the beam pipe
PIC-25-3-10half Shock absorbers under transport frame
PIC-25-3-11half End can
PIC-25-3-18half 25.10.2000
GO #3 on magnet test stand, hall 55
PIC-25-3-20half End can open to connect helium pipes
PIC-25-3-21half Helium in and out supply pipes connected
PIC-25-3-24half left: helium out, top: for over pressure valve, upper right: insulation vacuum
right: helium in, center: beam pipe
PIC-25-3-26half BNL label. Completion date for GO #3 was 11.10.2000
PIC-44-35small 31.1.2001
GO in Hall North
PIC-44-36small  
PIC-44-37small  
PIC-44-38small  
PIC-46-15small 15.2.2001
GO lead tower installed
PIC-46-16small  
PIC-46-17small  
PIC-51-01small  
PIC-51-02small  
PIC-51-11small  
PIC-51-12small  
PIC-51-13small  
PIC-51-14small  
PIC-51-14small  
PIC-55-01small  
PIC-55-02small  
PIC-55-03small  
PIC-55-23small  
PIC-55-24small  
PIC-55-25small  
PIC-55-26small  
PIC-58-03small  
PIC-63-01small  
PIC-63-02small  
PIC-63-23small  
PIC-63-24small  
PIC-77-22small GO fully connected: He in and out, insulation vacuum, beam pipe
PIC-77-23small  
PIC-89-06small  
PIC-89-07small  
PIC-89-09small  
PIC-89-12small  
PIC-90-08small The GO lead tower must fit between the muon chamber (green) and the iron (blue)
PIC-90-09small  
PIC-90-12small  
PIC-90-14small  
PIC-90-15small  
PIC-90-16small  
PIC-90-17small  
PIC-91-25small Beam loss monitor
PIC-92-09small View from the top
PIC-92-10small  
PIC-105-02half  
PIC-105-03half  


Last modified: Thu Jun 6 18:30:46 MEST 2002
A. Cyz, D. Pitzl