small | 22.9.2000
Central tracker out of cryostat in Hall North |
small | Central tracker end face, still fully cabled |
small | Cabling detail: CJC1, COZ, COP |
small | CJC preamp cards |
small | A sensor used to measure the beam pipe position for CST installation.
By P. Robmann, U Zürich, 1995 |
small | 16.10.2000 Central tracker in Hall 5 clean room with disassembly tools. K. Finke checks. |
small | Beam aligned through Central Tracker |
small | 25.10.2000 CIP, CIZ, CJC 1, COZ, COP removed |
small | CJC 1 open in front of filter wall in hall 5 clean room |
small | One cell of CJC 1. Rods hold the end plats during repair work |
small | Can you see the 25 micron sense wires? |
small | A. Schleiermacher prepares for CJC 2 removal |
small | 15.11.2000 and A. Guddat rewiring 20 sectors in the lower part of CJC 2 |
small | Inserting a wire |
small | A. Guddat prepares the next wire |
small | Dec 2000: HV test |
small | 19.12.00 CTD out of clean room in hall 5 |
small | |
small | Ready for survey 2.-3.1.2001 |
small | 4.1.2001 Truck transport to Hall North |
small | |
small | |
small | |
small | |
small | |
small | |
small | |
small | |
small | |
small | |
small | |
small | |
small | |
small | |
small | |
small | |
small | |
small | |
small | |
small | |
small | end Jan 2001 Waiting for the CIP |
small | |
small | 22.2.2001 CTD parked under the ceiling during FTD transport |
small | |
small | |
small | |
small |