CJC


Click on the picture for the full size (1280x1024 pixel) JPEG file,
click on "small" for a reduced size (384x307 pixel) JPEG file.

PIC-31-11small 22.9.2000
Central tracker out of cryostat in Hall North
PIC-31-10small Central tracker end face, still fully cabled
PIC-31-12small Cabling detail: CJC1, COZ, COP
PIC-31-13small CJC preamp cards
PIC-31-14small A sensor used to measure the beam pipe position for CST installation.
By P. Robmann, U Zürich, 1995
PIC-31-47small 16.10.2000
Central tracker in Hall 5 clean room with disassembly tools. K. Finke checks.
PIC-31-49small Beam aligned through Central Tracker
PIC-32-12small 25.10.2000
CIP, CIZ, CJC 1, COZ, COP removed
PIC-32-13small CJC 1 open in front of filter wall in hall 5 clean room
PIC-32-14small One cell of CJC 1. Rods hold the end plats during repair work
PIC-32-15small Can you see the 25 micron sense wires?
PIC-32-16small A. Schleiermacher prepares for CJC 2 removal
PIC-32-17small 15.11.2000
and A. Guddat rewiring 20 sectors in the lower part of CJC 2
PIC-32-18small Inserting a wire
PIC-32-19small A. Guddat prepares the next wire
PIC-38-57small Dec 2000: HV test
PIC-43-04small 19.12.00 CTD out of clean room in hall 5
PIC-43-01small  
PIC-43-03small Ready for survey 2.-3.1.2001
PIC-43-12small 4.1.2001
Truck transport to Hall North
PIC-43-13small  
PIC-43-14small  
PIC-43-15small  
PIC-43-16small  
PIC-43-17small  
PIC-43-18small  
PIC-43-19small  
PIC-43-21small  
PIC-43-22small  
PIC-43-23small  
PIC-43-24small  
PIC-43-25small  
PIC-43-27small  
PIC-43-29small  
PIC-43-30small  
PIC-43-31small  
PIC-43-32small  
PIC-43-34small  
PIC-43-35small  
PIC-43-36small  
PIC-44-33small end Jan 2001
Waiting for the CIP
PIC-44-34small  
PIC-49-01small 22.2.2001
CTD parked under the ceiling during FTD transport
PIC-49-10small  
PIC-49-16small  
PIC-49-18small  
PIC-49-20small  


Last modified: Mon Feb 26 19:09:37 MET 2001
A. Cyz, D. Pitzl