small | Nov 2000 all old magnets up to 64 m removed |
|
small | North Left (+z) | |
small | North Right (-z) also empty up to 64 m | |
small | The HERA tram is used to transfer magnets from halls East and West | |
small | Survey marks for the new magnets | |
small | Work in the Spin Rotator section of the e-ring | |
small | A quadrupole magnet is split to modify the vacuum chamber | |
small | ||
small | View NR towards Hall North | |
small | Comment | |
small | Normal conducting upgrade magnets from Efremov Institute,
St. Petersburg Tested in hall 2 and ready for installation |
|
small | First proton focussing half-quad 'GM'. This magnet defines the beam spot size at the IP |
|
small | 5.12.2000 first GM magnet installed at NL 17m | |
small | ||
small | ||
small | 5.12.2000 second GM also installed | |
small | ||
small | ||
small | ||
small | ||
small | e-beam quads for the spin rotator | |
small | Beam pipes for the e-beam quads in the spin rotator section | |
small | Beam pipes installed in e-beam quads in the NR spin rotator section | |
small | ||
small | ||
small | 20.12.2000 Install GM 13 and 17 m proton magnets NR |
|
small | Beam pipes are still missing - to be installed later... | |
small | ||
small | ||
small | ||
small | The mirror plate of the half-quads can be moved | |
small | 4.1.2001 Installation of a GN magnet with the HERA tram |
|
small | ||
small | ||
small | ||
small | ||
small | ||
small | ||
small | ||
small | ||
small | ||
small | ||
small | ||
small | ||
small | ||
small | ||
small | ||
small | ||
small | Vertical dipole for Spin Rotator | |
small | ||
small | ||
small | ||
small | ||
small | ||
small | ||
small | ||
small | ||
small | ||
small | ||
small | ||
small | ||
small | ||
small | ||
small | ||
small | ||
small | ||
small | ||
small | ||
small | ||
small | ||
small | ||
half | ||
half | ||
half | ||
half | Proton magnet dump switches had to be moved for FPS 60m station | |
half | Space for a PRT station | |
half | Helium valves for the NR octant | |
half | April 2001 NL all magnets installed |
|
half | ||
half | Last beam pipe sections are installed | |
half | ||
half | ||
half | ||
half | NR all magnets installed | |
half | Synchrotron radiation absorber NR 10m | |
half | ||
half | E-tag 40m | |
half | Skew quadrupoles | |
half | Beam pick up monitor NR | |
half | ||
half | Lead shielding against electrons North Left | |
half | e beam pipe at GB magnet has NEG pump | |
half | e beam pipe in GN magnet | |
half | SynRad absorber at NR 19m | |
half | ||
half | ./td> | |
half | ./td> |