Talks and Presentations
Online information, shift instructions etc.. (outdated)
Rate monitor history
How to restart TOF-DAQ, recover from
power glitch, etc.
(V.Dodonov)
(the old instruction )
Switching On/Off VETO
counters
Plots, diagrams, photos
BSTOF counter installed
(photo) ,
(other photos) ,
(more photos)
New
BTOF counter is assembled and installed
(photo 1) ,
(photo 2) ,
(drawing)
New
BTS
(Backward Taggind System) counters installed next to VETO counters.
STOF counter is repaired and installed
(drawing)
Scheme of a new TOF DAQ (ps-file)
Proposed scheme of updated TOF/VETO/FTS rate and 'beam-dump'-system
(pdf-file)
some photos
Other Documentation
The H1 TOF System in 1996 and 1997 (Internal Note)
Offline usage of the H1 vetosystem (Software note 38-05/93)
Note about the upgrade of the ToF and VETO System (Jan 99)
Short description of the modifications of the H1
Time-of-Flight System in the framework of the H1/HERA upgrade
Figures of the Note (EPS files)
Fig-1: Sketch of ToF system after the year 2000.
Fig-2: Sketch of the upgraded H1 Detector.
Fig-3: Sketch of the ToF electronics setup.
Fig-4: Sketch of the VETO electronics setup.
References:
List of H1-notes, Diploma theses and others:
TOF related links:
New BTOF counter
Large Vetowall
Small Vetowall
Forward Timing System
Spacal ToF
The FiT
Useful links:
This page was read
times
Last update: 7 August, 2007 by
Armen